Design Reuse
Search EETimes
Silicon IP Verification IP Software IP Wanted IP !!! Free Download IP Analytics (Restricted Access) FPGA Board / Kit Design Services Foundries Main IP/SoC Products Embedded Systems Design Platform / Structured ASIC Foundries FPGA / CPLD Fabless / IDM Deals Legal Business Financial Results People ESL Design Commentary / Analysis Main Silicon IP / SoC Verification IP FPGA / CPLD Embedded Systems Design Platform / Structured ASIC ESL Design ESL Design Standards & Best Practice Structured ASIC Verification IP Main On Cores Embedded Systems EDA Tools IP Cores Tool Demos D&R Partners Research / Market Reports Events Calendar Webcasts / Podcasts Online Bookstore



Tips to leveraging pre-integrated systems: How to get your application to market in 12 months


Related Articles

Latest Articles

Most Popular (Updated Daily)

Mike Coward, CTO, Continuous Computing
Oct 31, 2007 (2:06 PM) -- commsdesign.com

Telecom infrastructure development is moving into a third phase of infrastructure development: the shift to pre-integrated systems that include high availability middleware, protocol stacks, unified management, and hardware platforms. These systems offer a quick path to market since the equipment manufacturer develops only the application that runs on the system.

The first phase of infrastructure development had telecom equipment manufacturers (TEMs) using a vertically-integrated approach: designing their own silicon, building custom chassis and boards, and writing all of the software in the system, including operating systems, databases, protocol stacks, and applications.

The second phase of infrastructure development was marked by a shift to the commercial off the shelf (COTS) model where the individual blades and software modules are procured from different vendors and integrated together by the TEM. The COTS model offers an improvement in time-to-market and lower development costs but is not without problems. In particular, the time it takes to integrate the components has become a significant part of the overall schedule, and it has proven difficult to reduce time-to-market below 24 months because of this integration time.

This desire for even quicker time-to-market has given rise to a third model, the pre-integrated system. Pre-integrated systems feature a comprehensive software stack built on a standards-based hardware platform, designed and tuned for particular network elements. In the best examples of this third phase of infrastructure development, the system includes reference applications, protocol stacks, unified management, high availability middleware, platform essential services, and a competitive hardware platform. An example of an integrated system, the Continuous Computing FlexTCA system for IPTV, Security Gateways, and Wireless Core Infrastructure is shown in Figure 1.

Click here to read more ...





   

Add your Opinion

   

 

E-mail This Article Printer-Friendly Page


<A HREF="http://www.design-reuse.com/banner/exit.php?id=445" target="_top"><IMG SRC="http://www.us.design-reuse.com/adserver/www/images/eureka_static.jpg" WIDTH=125 HEIGHT=125 BORDER=0></A>